Terrors overwhelm me; my dignity is driven away as by the wind, my safety vanishes like a cloud. x

Mr Voukelatos compares the reports and states that the Bekker report seems very superficial and he wonders why I still insist that there is a problem with the wall and whether I had obtained the report for the purpose of obtaining compensation from Council.

12.03.03 Mr Voukelatos to Mr Johnston LE 1-2, 457-8

“Thank you for your report dated 10/3/03.

I made the tenant aware of your findings, however, he is still insisting that there is a problem with the wall and is using it as an excuse not to pay rent.

Today he sent me a report he obtained on 30/10/02 from an engineer called Paul Bekker which I attach for your perusal. To me, the report seems very superficial & does not go into a deep analysis of how he reached his conclusions & seems to be what you call “the easy option of condemning the wall”. This is supported by a comparison of the Bekker report and your report on the same wall which was prepared on 25 June 2001.

I wonder whether Amir had obtained the report for the purpose of obtaining from Council compensation (as he keeps mentioning such a claim) for damages done by the tree roots in the park. What I can’t understand is why he waited over 4 months to show me the Bekker report. If the wall is such a problem, why he did also bother to have pre-D.A. meetings and prepare a D.A. for my urgent signature. I believe as stated to you the other day his only real interest is to get: further extension of the lease period another rent-free period

Since as part of his proposed D.A. this wall will need to be supported to enable the opening to be made. (see copy of plan from Amir’s architects ESZ in respect of the eastern wall.

Do you think the wall is safe as it presently stands? Is it in danger of collapse?

Perhaps we can discuss this & I’ll try to contact you about 5 pm. Tuesday (your time).

I’ve decided to basically hand over this matter to my lawyer (Theo Casimatis) since as discussed the tenant has breached the lease on a range of matters and is being very difficult.”

Sending images and report

I send Mr Voukelatos images of the structural problems and I faxed him Mr Bekker’s report.   

14.03.03 Me to Mr Voukelatos EC 1-5, 191-5

“The images are sized so that transmission via the internet will not be a hazard to you.

If you require enlargement let me know.

I will call you during the weekend.”

Development Application Lodgment (17.04.03)

A lot of time, effort and resources were invested in the D.A. process.

Compliance with Mr Voukelatos’ demands

Paying rent EA 2-6, 184-8

Plans send on 9 February 2003 FM 1, 261

Structural engineers’ letter CK 1-2, 129-30

Insurance Certificate with Mr Voukelatos’ name            

03.04.03 Mr Casimatis to Me FP 1, 264

“I enclosed Application for Development Consent executed by Zois Voukelatos and Vessela Voukelatos.”

06.04.03 Mr Voukelatos to Me ED 1, 196

“Further to our discussion yesterday I wish to advise you that:

As stated in my letter to you dated 11/3/03 we cannot grant you a further extension in the Lease period for the reasons outlined in that letter.

We cannot grant you a further rent free period. You will recall the rental paid in

2.   The first 12 months of the Lease was designed to assist you and effectively gave you a rent free period of some 3 months.

These issue have been raised by you many times in the past and we regret that there is no further point in discussing this.”

We would prefer to see you lodge the D.A. with Leichhardt Council to enable commencement of your business.”

D.A submission

17.04.03 Application for D.A. Consent FQ 1-3, 265-7.

“Rec Date: 17 Apr-2003

 Amount Total: 1225.20”

“Estimated cost: $180,000”

“Signature of Owners/         Date 15/2/03”

Statement of Environmental Effects FR 1-9, 268-76

“Introduction

1. Existing Building

Since leasing the property on January 2002 and having investigated the buildings structural integrity, it has become apparent that the existing properties’ unstable eastern wall has attributed to the property being vacant since November 2001. Based on engineering advice, the building would require a new eastern wall before any new activity takes place within the building.

Prior to November 2001 the premises had been used as a café/restaurant, exchanging hands quite often.

2. Morden Paint

Having lived and worked in the Glebe neighborhood for over two years, the team behind the “Moroccan” restaurant /café concept recognize the potential of this site. Hence, we have lease the property for the next 15-years with a commitment to transferring this ailing property from a neighborhood “dark spot” to a building that will raise the neighborhood profile. We are an ambitious team that provides a high level of quality in workmanship and Moroccan food.

3. Community

In a bid to gain a broad and accurate representation from our immediate neighbors and the community at large, we have sought their feedback in relation to our aspirations for this site. We include this feedback for your perusal in this proposal.

4. Site Layouts and Building Design

Structural Integrity

A report has been prepared in regards to the structural adequacy of the existing building and the work proposed, specifically the construction of the eastern wall (Refer to Appendix C)

6. Elevations and Material

We are proposing to incorporate some indigenous artwork created by local community youth on the ‘bookend’ of the eastern wall. We approached community artist, Elizabeth Ronney, who will coordinate the design of this work. (Refer to Appendix E)

8. Seating

It is proposed to provide thirty-four tables within the restaurant/café at ground floor and first floor.

A separate application for a license/leasing arrangement for outside seating will be submitted at a later stage.

14. Conclusion